Follow the official Nroro instructions for each product. The warranty requires installation according to these instructions.
| SPC click flooring | Installation guide (PDF) — coming soon |
| LVT glue-down | Installation guide (PDF) — coming soon |
| Slat wall panels | Installation guide (PDF) — coming soon |
| Flat wall panels | Installation guide (PDF) — coming soon |
| Trims & stair parts | Installation guide (PDF) — coming soon |
| Care & maintenance | Guide (PDF) — coming soon |
Need a guide now? Email us (address below).
SPC click — before you start
- Acclimate boxes at least 48 hours at 60–85°F and 30–55% relative humidity.
- Subfloor flat, clean and dry; level any dip greater than 3/16" over 10 ft.
- New concrete: cure at least 90 days; use a 6-mil polyethylene moisture barrier.
- Nroro SPC planks have a 1.5 mm IXPE pad attached: no separate pad.
- Interior use only. Leave a 12 mm (1/2") expansion gap at walls and fixed objects.
- Runs longer than 10 m (32.8 ft) in either direction need a T-molding.
- Radiant heat: floor surface no warmer than 85°F (29.8°C). Not for wet areas.
Email or call: info@nroro.com · (808) 210-4806