Installation guide
SPC click flooring — installation guide
How to install Nroro SPC click flooring with attached pad: site conditions, subfloor, layout, trims, stairs and care.
PDF · October 2026
PDF · October 2026
The Nroro warranty requires installation according to this guide. Read it fully before you start, and inspect every plank before it goes down — visible defects are not covered once a plank is installed.
1. Where you can install
- Indoors only, in climate-controlled rooms (60–85°F, 30–55% relative humidity before and during installation).
- Residential and light commercial floors. Not for ramps, floors sloped for drainage, outdoor areas, or rooms that flood.
- Maximum room size without a break: 32.8 ft (10 m) in length and in width. Larger areas need a T-molding to split the floor.
- Install cabinets and fixed islands first. Never fix cabinets or heavy built-ins on top of a floating floor.
2. Acclimate and plan
- Keep the cartons flat in the room for at least 48 hours at 60–85°F and 30–55% relative humidity. Stack no more than 10 cartons high and keep them off bare concrete.
- Order about 5% extra for cuts, or 10–15% for diagonal layouts.
- Open 4–5 cartons at a time and mix planks so the pattern looks natural.
- Remove baseboard, quarter round and cove base. Undercut door casings to the floor height; doors need at least 3/8 in (about 10 mm) clearance above the finished floor.
- Run planks along the longest wall, ideally parallel to the main light source.
3. Tools
Tape measure, chalk line, square, utility knife, fine-tooth saw for cross-cuts, tapping block, pull bar, rubber mallet, 1/2 in (12 mm) spacers, safety glasses.
4. Subfloor
- Flat, clean, dry and solid. Level any dip or hump greater than 3/16 in over 10 ft. Keep a record of your flatness and moisture tests.
- Concrete: moisture emission no more than 5 lb / 1,000 sq ft / 24 h (ASTM F1869) or 85% RH (ASTM F2170). New slabs must cure at least 90 days. Patch cracks and holes with a latex patching compound. Always lay a 6-mil polyethylene moisture barrier over concrete.
- Wood: solid and flat — sand high spots, fill low spots, fasten loose boards.
- Ceramic tile, terrazzo, mosaic: solid and flat; level grout lines wider or deeper than 3/16 in (5 mm).
- Remove carpet. Do not install over soft subfloors, or over wood or laminate that was laid directly on concrete or bitumen.
- Nroro SPC planks have an attached 1.5 mm IXPE pad — do not add a second pad underneath.
5. Radiant heat
- The floor surface must never exceed 85°F.
- Hold the floor at 70°F or below for 48 hours before, during and 48 hours after installation, then raise the temperature gradually.
- Leave a slightly larger expansion gap and use a wider baseboard to cover it. Radiant systems laid directly on the subfloor surface are not recommended.
6. Install the planks
- Snap a chalk line for the first row. Start in the left corner with the tongue side facing the wall, using spacers for a 1/2 in (12 mm) gap at every wall and fixed object.
- Click the next plank end-to-end: hold it at about 30°, engage the joint and lower it flat. Keep the row straight.
- At the end of the row, measure and cut the last plank so the 1/2 in gap remains. Start the next row with the leftover piece — it must be at least 12 in (30 cm) long.
- Long side: angle the plank about 30° into the previous row and lower it; use the tapping block and mallet lightly until the joint closes. Never hit the plank edge directly.
- Plan the last row: it must be at least 2 in wide. If needed, make the first row narrower.
- Door frames: slide planks under the undercut casing; use the pull bar where you cannot angle a plank. Leave at least a 3/8 in (10 mm) gap at door frames.
- Remove the spacers and sweep the floor with a soft brush.
7. Trims and stairs
- Baseboard or quarter round covers the expansion gap. Fasten it to the wall, never to the floor.
- T-molding: doorways between rooms and any run longer than 32.8 ft. Reducer: where the floor meets a lower surface. End cap: at sliding doors, fireplaces and other fixed edges.
- Stairs: use Nroro stair treads with flush or overlapping stair nose in the matching color. Bond stair parts with a construction adhesive suited to vinyl and the stair material, following the adhesive maker's instructions.
All Nroro trims are made in the color of each SPC design — give the design code when you order.
8. Care
- Keep the room at 60–85°F and 40–70% relative humidity.
- Put mats at outside doors. Sweep or dust-mop daily.
- Clean with a diluted gentle cleaner, then rinse with clean water. Machines: white pad, 175 rpm.
- Never use abrasives, bleach, ammonia, vinegar cleaners, wax or acrylic polish, or oil soaps.
- Use felt or rubber pads under furniture, soft rubber chair wheels, and never drag heavy objects. Protect the floor from strong direct sunlight.
Questions
Email info@nroro.com or call (808) 210-4806. Warranty: nroro.com/pages/warranty
Videos
Installation videos filmed at the factory. They show the same method as this guide.